Home -
Cherokee Hills Wired -
Pickens County Wired -
EMAIL ME


December 2007
Nov. 20 - Dec 3, 2007 - .. Sorry all I have been busy this last couple of weeks. Looks like drywall was delivered, stones were started on fireplace, Ceiling of main floor installed, stairs finished.






Dec 4, 2007 - Inserts for fireplace started.



Dec 5, 2007 - Another inspection done and we passed. Inserts for fireplace done. Fireplace installed. More stones put on exterior fireplace. Concrete for back patio poured.
Dec 6-10, 2007 - Nothing done.



Dec 11-14, 2007 - More stones put on fireplace. Some sheet rock put in. When I took pictures they were putting up the drywall for the master bedroom and bath.








Dec 15, 2007 - Stairs in garage worked on. I think after drywall comes the floors and cabinets.. wheeeeeeeeee's getting there!
Dec 17, 2007 - Drywall work done in master bedroom and bath. More stone work done on fireplace.
Dec 18, 2007 - Drywall work started in basement. More stone work done on fireplace.


Dec 19, 2007 - More drywall work done in basement. Talked with a woman about doing some painting and wallpaper. Telephone hooked up. More stones put on fireplace. Stones being added to back patio.






Dec 20, 2007 - Basement drywall finished. More stones put on fireplace. started on interior fireplace. Talked with a painter.
Dec 21, 2007 - Went and checked out wall paper at a few places for some that looks like logs(check out below! Want this 1 for sure for Kitchen and master bedroom!). Drywall started in garage and a couple of guys came by to check on what we needed for the interior doors.

| Pattern #: | CH7979 |
| Retail Price: | $36.00 |
| Collection Name: | Chestnut Lodge |
| Type: | Sidewall |
| Width: | 27" |
| Length: | 9 yds |
| Hanging Match: | Straight |
| Repeat: | 24" |
| Prepasted: | Yes |
| Composition: | Vinyl Protected |
| Washable/Scrubbable: | Scrubbable |
| Coordinating Fabric: | No |
| Available in 54": | No |
| Description: | Mountain Logs Sidewall |
| Description/Care: | Golden |
Dec 22-23, 2007 - Nothing going to get done. Dave got us the wallpaper above for a REALLY good price that I had found on EBAY.
Dec 24, 2007 - Stone being added to interior fireplace.
Dec 25, 2007 - More stones being added to interior fireplace. Some of the driveway wall started. My mom got us the bear bedding and stuffed TY bear.
Dec 26, 2007 - More drywall work done.
Dec 27, 2007 - More drywall work done.

Dec 28, 2007 - Dry wall finished. I ordered the above, border, shower curtain and hooks for the master bath. We have some one to do the wall paper so wanted to be sure I had the border and the matching shower curtain while she was here.

Free Christmas Graphics