Jan 1, 2008 - No work done.



Jan 2-5, 2008 - More framing done around windows. Some interior doors being installed in "The Dog House" as Dave calls it.



Jan 8, 2008 - Interior fireplace done.. More stones added to retaining wall.


Jan 11, 2008 - AC/Heater installed. Tiles for bathrooms delivered. More framing done around windows.


Jan 12-13, 2008 - Some tiles installed in bethrooms

Jan 14, 2008 - Garage doors installed (I'll get a picture when they are down).






Jan 16, 2008 - It snowed!!!

Jan 17, 2008 - Interior doors delivered, Tile guys did some more.. More framing done around windows.


Jan 18, 2008 - It's snowing again. and cold... but work goes on.. Dave got a fire going in fireplace. Breezeway tiles done except for the grout. Most of the doors are hung in the house.

Jan 20, 2008 - Heat connected up and running today

Jan 25, 2008 - More flooring put in entertainment room.

Jan 26, 2008 - Met with landscaper on where pond should go. Floors done in entertainment room and breezeway.

Jan 27, 2008 - Bleaching and cleaning of inside logs done.


Jan 28, 2008 - Busy day today.. Met with painter to pick out paint colors.. Gutters were installed. Rock guys doing more on the retaining wall. Sealer added to walls and doors and ceilings in basement were painted. Today was the first day I got to see the garage doors.. so I got a picture of them too.