(revamped page July 11, 2007 .. hope it loads faster for ya! each month will now be seperated.)
July 3, 2007 - Footers for garage dug out.
July 5, 2007 - Footers for garage poured.
July 9, 2007 - Some walls in the basement are starting to take shape.
July 10, 2007 - Some more walls were starting to take effect
July 11, 2007 - Revamped website, readded some of what I took out from before. More work done to house. Preperation being done to pour for garage.
July 12, 2007 - A look from the top of the basement. Basement framing I think is finished and concrete poured for garage except for floor.
Received a design idea for kitchen it looks really good. Probably going for unstained oak with granite counter tops.
July 16, 2007 - Wheeeeeeeeeeeee!! They started adding the logs to the garage.. Dave met with guy who will be ding trusses and talked with an electrician
July 17, 2007 - Windows and doors were delivered. Some more logs were added and trench dug for plumbing.
July 18, 2007 - Some more logs were added. Humm wonder if the start on upstairs tomorrow?
July 19, 2007 - Sub-flooring added..
July 23, 2007 - Some framing for the apartment done. Cement poured for the breezeway.
July 24, 2007 - Some more framing for the apartment done. Cement poured for flooring in garage.
July 25, 2007 - Some framing of the roof done.
July 26, 2007 - Some more roof done.
July 30, 2007 - The floor trusses for the main house were delivered today says they will start on them tomorrow.. Dave and I went to look at shingles.. opting for Rustic Evergreen. Now need to find someone to install them. Stairs from the garage to the apartment were done.
July 31, 2007 - Pretty much all that was done today was the floor trusses for the main house were put on.. this is where all the duct work, wiring and plumbing will go.